The Transformation Process

We had to start from scratch on this project which took around 4 weeks to complete. We started by looking at the boundary to the property and replaced one of the boundary fences which was rotten with concrete posts, concrete gravel boards and heavy duty feather edge panels.
Paving
This was one of the most important parts of the project as our customer wanted a large useable outside space, so we extended the patio massively using a light coloured porcelain paving with a nice contrasting charcoal border.
New Lawn
The existing lawn had a number of problems, so we installed land drainage and soakaways into the lawn area to help with the drainage problems that were occurring.
We then completely returfed the garden, it was a large area and we used around 250 rolls of turf!
Sleeper Beds
Finally we installed some raised sleeper beds around the garden to create low maintenance planting beds for added interest and colour throughout the seasons. Take a look at the finished result in our latest video below.